
Tower storage systems
Many parts. Limited floor space. Vertical storage organises loading and retrieval of your components.
Automation for electronics manufacturing
Storage, transport and material data. Planned together for your SMT production.
Explore solutions
Choose your process. Explore the right technology.

Many parts. Limited floor space. Vertical storage organises loading and retrieval of your components.

Find and identify reels. Guided storage locations support your team during putaway and picking.

Bring materials where they are needed. Vehicles, routes and handovers are configured for your production.

Plan storage and SMT lines together. With coordinated buffers, carriers and handover points.

System concept: connecting material movements.
Know which material is where. Bring inventory and movements together and connect them to your existing IT.

Stored SMD reels. The counting station is configured separately.
Record remaining quantities reliably. Connect counting with material identification, verification and inventory transactions.
Not sure what fits? Open solution finder
Follow the journey through production. Material and information connect at every station.
Illustrative flow within the system conceptThe package is recorded at receiving, allowing the reel to be identified throughout the process.
The system assigns a storage location. Suitable equipment depends on the material mix and access requirements.
Transport, buffers and handovers are coordinated to supply the SMT line.
After production, remaining quantities are checked. The reel returns to storage with an updated inventory record.
Turning this into your project: we review processes, coordinate handovers and support integration.
Working with allSMTIt includes coordinated storage, transport and information processes: storing materials, preparing orders, supplying the line and updating inventory. We define the automation scope for your project.
We recommend defining a limited initial scope: for example, one storage area and one supplied line, the associated transactions and clear acceptance criteria. We assess staged expansion against the selected systems.
Explore this solutionCompare current searching, picking, transport and stock-correction effort with the planned process. Include investment, integration, operation and maintenance in the same calculation. A generic payback period would not be reliable without your operating data.
Explore this solutionYour next step